Network connection

The connection rules sit outside both the legislation and the product specification. This is where the one device per household limit comes from.

InstrumentEREC G98 Issue 2 Amd 1
RouteDCRP/MP/26/02
Approved11 August 2026

4.1How the change was made

ProposalDCRP/MP/26/02, a Distribution Code modification
Raised byEnergy Networks Association, 1 April 2026
DecisionApproved by the Authority, decision document dated 11 August 2026
ImplementationTied to the PSSR and ESQCR amendments coming into force, which occurred 27 August 2026

Source: Ofgem, DCRP/MP/26/02

4.2The quantity limit

G98 Issue 2 Amendment 1 restricts plug-in solar to one device per household. This is tighter than the product specification's one per final ring circuit, and it is the limit that applies in practice.

4.3Notification

DESNZ's final stage impact assessment describes registering product use with the distribution network operator in Great Britain. This is a short online form, completed within 28 days of installation, giving your name, email address and installation address. It is expected to take five to ten minutes.

Wording

The impact assessment describes the intended process. It does not state this as a formal obligation. This site tells you what you are asked to do. For the authoritative wording, read G98 itself.

4.4The fourteen GB licence areas

Licence areaOperator
East EnglandEastern Power Networks plc
East MidlandsNational Grid Electricity Distribution (East Midlands) plc
LondonLondon Power Networks plc
North Wales, Merseyside and CheshireSP Manweb plc
West MidlandsNational Grid Electricity Distribution (West Midlands) plc
North East EnglandNorthern Powergrid (Northeast) plc
North West EnglandElectricity North West Limited
North ScotlandScottish Hydro-Electric Power Distribution plc
South and Central ScotlandSP Distribution plc
South East EnglandSouth Eastern Power Networks plc
Southern EnglandSouthern Electric Power Distribution plc
South WalesNational Grid Electricity Distribution (South Wales) plc
South West EnglandNational Grid Electricity Distribution (South West) plc
YorkshireNorthern Powergrid (Yorkshire) plc
Provisional

This table is a working map. It has not yet been verified area by area against each operator's own postcode checker, so confirm with the operator before relying on it. Scotland has two operators. SP Manweb covers Merseyside and Cheshire alongside North Wales. The South East is divided between two operators as well.